Westney Road Multi-Use Public Information Centre (PIC)

This project was initiated by the Regional Municipality of Durham with consultation from the Town of Ajax with engineering services provided by R.J. Burnside and Associates Ltd.

Project Overview

Project Limits: Kingston Road West to Magill Drive

Proposed Features:

  • Multi-use path (MUP): 2.4 to 3.5 metres wide.
  • Crossride treatments: At intersections and entrances.
  • Connectivity: Opportunities to connect to existing active transportation (AT) facilities.
  • Pedestrian ramps: Upgrade existing ramps.

Development of Preliminary Designs

Step 1: Site visit to document existing conditions.

Step 2: Initiate supporting investigations.

Step 3: Complete facility selection.

Step 4: Determine which boulevard to place multi-use path.

Step 5: Draft layout and typical sections.



Opportunities


Connection to existing and proposed multi-use path.

Connection to Trans Canada Trail.

Connection to Great Lakes Waterfront Trail.

Upgrade existing facility to meet Accessibility for Ontarians with Disabilities Act standards for pedestrian ramps.



Please contact Fariha Mannan with any questions by email at fariha.mannan@durham.ca.

This project was initiated by the Regional Municipality of Durham with consultation from the Town of Ajax with engineering services provided by R.J. Burnside and Associates Ltd.

Project Overview

Project Limits: Kingston Road West to Magill Drive

Proposed Features:

  • Multi-use path (MUP): 2.4 to 3.5 metres wide.
  • Crossride treatments: At intersections and entrances.
  • Connectivity: Opportunities to connect to existing active transportation (AT) facilities.
  • Pedestrian ramps: Upgrade existing ramps.

Development of Preliminary Designs

Step 1: Site visit to document existing conditions.

Step 2: Initiate supporting investigations.

Step 3: Complete facility selection.

Step 4: Determine which boulevard to place multi-use path.

Step 5: Draft layout and typical sections.



Opportunities


Connection to existing and proposed multi-use path.

Connection to Trans Canada Trail.

Connection to Great Lakes Waterfront Trail.

Upgrade existing facility to meet Accessibility for Ontarians with Disabilities Act standards for pedestrian ramps.



Please contact Fariha Mannan with any questions by email at fariha.mannan@durham.ca.

Discussions: All (1) Open (1)
  • We invite all residents to share their questions, comments, or concerns about this project. Your feedback is invaluable in helping us create a space that meets everyone's needs. Please post your thoughts below and join the conversation! 

    Quick Reply
    Reply notification settings
    loader image
    Didn't receive confirmation?
    Seems like you are already registered, please provide the password. Forgot your password? Create a new one now.
    Submitting your comment
    Cancel
Page last updated: 27 Mar 2025, 02:56 PM